Skip to main content

Site Engineering Manager

This job is brought to you by Jobs/Redefined, the UK's leading over-50s age inclusive jobs board.

Vacancy Name
Site Engineering Manager

Employment Type
Permanent

Country
United Kingdom

Location
Wisbech

Business Area
Operations

Workplace Type
Hybrid

About Princes
The Princes Group has over 7,000 employees with offices and production sites in the UK, Netherlands, Italy, Poland, France and Mauritius. Princes manufactures 350 different food and drink products responsibly sourced and enjoyed by consumers every day. None of this would be possible without striving to be an employer of choice, where our colleagues are proud to represent our business.

Role Description

Job Purpose

Reporting to the Head of operations , this role will have responsibility for proactively planning, controlling and coordinating all aspects of the Engineering function to ensure optimum equipment performance efficiency as part of the overall sites performance measures. All practices must be implemented and operate within Health, Safety & Environmental legislation and site policies and procedures as appropriate.

Whilst the role is site based, it forms part of a business which recognises the need for change with major growth ambitions and as part of which is highly likely to expand both in the UK and overseas. The role will need to be flexible and provide support as required to capitalise on whatever opportunities arise.

To coordinate the Engineering function to help the site achieve optimal operational efficiency at lowest cost through the delivery of targets against the strategic objectives of the Group Supply function:

  • Quality
  • Cost
  • Delivery
  • Safety
  • People.

Key Responsibilities

  • Safety, Quality, Hygiene
  • Undertake duties in a responsible manner giving due consideration to Safety, Environmental & Quality procedures, which form part of the Integrated Management System.
  • Ensure work undertaken conforms to legislative requirements
  • Embrace a culture of safe behavior and contractor health and safety within the production and engineering areas
  • Support and embrace a culture enhancing behavioral awareness to reduce accidents, incidents and near misses.
  • Asset Management
  • Develop efficient and effective asset care programs to champion availability across both sites, standardising the asset care approach with the drive to ensure effective maintenance systems, in line with the Group PMS Roadmap & the Maturity Matrix site development tool.
  • Develop the asset care strategy for both sites around the Princes interpretation of the JIPM model involving AM, PRM and EEM.
  • To drive the transition from reactive to proactive with targets of 80% of Engineering work planned in advance, 20% of engineering time on C.I. with 75% known utilisation of engineers.
  • Ensuring cost of maintenance and maintaining assets is transparent and known.
  • Development SAP PM and other systems to drive planning and control and focussed improvements.
  • Create, implement and manage both maintenance and capital expenditure budgets for the Canning plants, utilising Princes methodology and Group support to achieve the plants and business requirements.

Stores Management

  • Develop effective materials management with optimized levels of spares and stock accuracy and service levels and known cost of asset spares.
  • Manage the engineering stores so that Princes Group guidelines are adhered and that the supplier base is regularly reviewed to provide most cost effective service
  • Review stock levels to apply the most cost effective solution with no impact on the Factory`s KPI`s
  • Work within Group KPI framework to drive continuous improvement in working capital management.

Services and Energy Management

  • Manage site facilities, ensure that statutory compliance is adhered and performance standards are at such that best practice is applied for the environmental impact and continuity of supply
  • Work within a site services KPI framework to drive performance standards of Water, Air, Gas, Electricity and Steam.
  • Work within Group Energy strategy framework to drive continuous improvements in energy consumption and drive down the costs.

Electrical Management

  • Ensure electrical standards are at a minimum compliant with current relevant legislation and the Princes group standards
  • Work closely and have a good working relationship with the Group Electrical Manager who will support with the complete compliance programme.

Manufacturing Engineering Management

  • Drive operating standards of the machinery
  • Minor capital management
  • V Curve adherence
  • Ensure speed plate rated standards of machinery are adhered to
  • Significant input in Labour levels
  • Drive Performance efficiency as part of OEE

Manufacturing Systems Engineering Management

  • Support and assist in MES development
  • Performance management systems
  • Quality systems development
  • Energy monitoring development

Capital Plan Management

  • This role will have responsibility for planning and executing the Capital plan for their respective site / sites. The role will also have an input into forward strategy for the site and sector.
  • Working with Head of Operations, Group Engineering and the Site Leadership teams to manage the implementation of capital projects from initial concept, capital expenditure paper creation through to successful conclusion and sign-off, including:
  • Preparation and enabling work.
  • Installation and commissioning.
  • Training and performance trials.
  • Undertake technical and equipment benchmarking where appropriate to ensure the company continues to maintain its competitive edge.
  • Ensure compliance with Group Engineering standards, legislation and best practice with regard to health & safety and CDM regulations at all times.
  • Assist with the development and implementation of Group Engineering standards for the business and ensure compliance at all times.
  • Raise and approving where applicable, capital purchase orders and authorise the payment of invoices through SAP, ensuring that project costs are managed within agreed budgets.

Continuous Improvement

  • Promote and drive 5S and GMP, drive RCA, and other continuous improvement tools to identify areas for improvement and establish targets to ensure that the productive capability of the plant is optimized and improved for the needs of the business.
  • Systematically review performance, identifying and implementing opportunities to improve equipment reliability and efficiency using the tools available. Develop and manage agreed projects and ensure completion to time and budget, ensuring minimal disruption to the production units.
  • Evoke a proactive approach to change and improvements in the performance of the sites.
  • To challenge the status quo, driving a culture of best practice and continuous improvement that focuses on elimination of waste in all forms.

Manage/Develop People

  • Ensure that the engineering workforce is appropriately recruited, trained and managed to be able effectively and safely to deliver their tasks and ensuring the stability and continuity of this workforce consistent with the long-term needs of the factory. This includes where appropriate managing and developing team members in line with Princes guidelines on performance management.
  • Align self and deploy resource appropriately to meet the sites and group strategy.
  • Continually asses and develop the team to achieve Canning operational goals.
  • Challenge work practices and processes to achieve improved operational performance.
  • Manages, develops and motivates the engineering teams ensuring they have the appropriate skills, knowledge and experience necessary to carry out engineering projects effectively.
  • Conduct self in line with the Group values and behaviors at all times.
  • Develop a culture of ownership within the team for the on-going development of the facilities.

Technical Leadership

  • Act as first point of technical support for Operations and Shift managers. Apply defined best practice in all engineering and maintenance matters. Develop and apply own specialist technical skills in support of factory KPI`s.
  • Ensure that all engineering team leaders and technicians have full understanding of the fundamentals of the production processes at the factory and that new technology and management procedures are introduced in a manner that improves the cost base and competitive position of the factory.

Carry out any other tasks as may be reasonably requested by your line manager.

These are the key daily tasks, not a comprehensive list of all tasks undertaken by the jobholder. Flexibility is required by the business & this will be agreed with the individual`s line manager.

Role Requirements

Experience Required

  • Graduate or of Graduate calibre, ideally with a further engineering qualification, hands-on experience with a demonstrable track record of success.
  • Demonstrable track record of achieving results / managing change.
  • Strong operational grounding within a complex fast moving manufacturing environment.
  • Operated and familiar with implementation of the principles of World Class Manufacturing environments / Continuous Improvement methodologies.
  • Track record of leadership in the planning and subsequent implementation of capital investment in production facilities.
  • Experience of delivering results against financial targets, service levels and safety standards.
  • Good working knowledge of operating systems such as SAP, AutoCAD, Microsoft Word, Excel, PowerPoint and Project.
  • Excellent written and verbal communication skills.
  • Experience of managing people and dealing with Trade Unions
  • Experience of operating utilities plant and project management
  • Practical electrical engineering experience including legislation - Preferable
  • Previous experience of control engineering preferable

#LI-AG1
#HYBRID

Site Engineering Manager

Princes Limited
Wisbech, UK
Full-Time

Published on 05/05/2024

Share this job now